Search

Yiwu Port (CNYIU)

Port Code CNYIU City Yiwu
Port Name YIWU Country/Region China
Category Port City Route CHINA MAINLAND
Nearby Main Port Inland Transport
Official Website Port Type Dry Port

Introduction of Yiwu Port (CNYIU)

Overview:

Yiwu International Dry Port (Port of Yiwu) is located at No. 266, Chengxin Avenue, Yiwu City, also called Yiwu Inland Port Station. Yiwu Port is a key project in Zhejiang Province and an important infrastructure for Yiwu’s “Great Customs Clearance” construction. It is of great significance to improve the function of an international commercial city.

Yiwu Port

  • On May 1, 2013, at the 69th annual meeting of the United Nations Economic and Social Commission for Asia and the Pacific (ESCAP) held in Bangkok, Thailand, the "Intergovernmental Dry Port Agreement" (hereinafter referred to as the "Agreement") was formally adopted as a resolution. At the meeting, Yiwu was included in the "Agreement" as the only land port city in Zhejiang Province and my country's first batch of dry ports. This means that Yiwu has become an international dry port city. In the future, Yiwu will enjoy more preferential and convenient customs clearance policies in the Asia-Pacific region, especially the relevant preferential policies for the Pan-Asian Railway and the Pan-Asian Highway. Yiwu's international influence and position in international trade will be further enhanced. The Yiwu Port project covers a total area of ​​1,050 acres, with a total construction area of ​​940,000 m2, a designed annual freight volume of 1.144 million TEUs, and a total estimated investment of about 3 billion yuan. The entire project adopts a one-time plan and is constructed in two phases.
  •  The first phase of the project covers an area of ​​394 mu, with a construction area of ​​430,000 m2, and an estimated investment of 1.441 billion yuan. Including two supporting business buildings and a three-dimensional storage area. The project officially started in May 2009 and officially put into use in October 2011. The second phase of the project covers an area of ​​656 mu, estimated  The estimated investment is about 1.6 billion yuan. Currently under construction.
  • Yiwu Port is designed according to port functions, has convenient customs, inspection and quarantine supervision, customs clearance functions, large-scale storage and modern office conditions, and can provide one-stop customs clearance services. After the station is put into use, it will provide convenient services for the export of small commodities in our city. The building form of the warehouse is currently a relatively advanced three-dimensional (three-story) in China, and trucks can go upstairs directly, which greatly saves land resources.

Yiwu Port Phase I

  • The first phase of the project is located at the intersection of Chengzhong North Road and Yinhai Road in Yiwu City, adjacent to the International Trade City. It covers an area of ​​394 acres and has a construction area of ​​430,000 square meters. The investment is 1.45 billion yuan, including a three-story building with a construction area of ​​360,000 square meters. The three-dimensional warehouse and two supporting service buildings can simultaneously meet the packing operation of 494 trucks. The designed annual export volume of containers is 500,000 TEUs. The annual design freight volume is 600,000 TEUs. The second phase of Yiwu Port is also under construction, with an investment of 1.6 billion yuan and an area of ​​650 mu
  • In line with the principle of "conducive to the transformation and upgrading of Yiwu's logistics industry and reduction of international logistics costs", the investment promotion work was carried out, and a total of 217 foreign trade export companies were introduced, including COSCO, China Shipping, President Lines of the United States, Japan Cruise Line and CMA CGM There are 10 well-known international shipping companies and 31 large-scale freight forwarding companies.

Yiwu Port Phase II

  • Construction of the second phase of Yiwu Port has started, and the foundation reinforcement construction unit of the second phase of "Yiwu Port" is stepping up the dynamic consolidation operation to accelerate the progress of the second phase of the project.
  • The second phase of the "Yiwu Port" project covers a total area of ​​656 acres. The main functions are customs supervision areas and warehouses. The total investment is 1.68 billion yuan. By the end of November, except for individual plots that were actively coordinated by the inland port headquarters, the pre-phase plots of the second phase of the project had been relocated and 80% of the earthwork leveling works had been completed.

Other Ports in China

Leave a Message

* Tell us which Seaport info wrong or missing.